Construction cost estimating puts a defensible number on a project at each stage of design. Terrahills produces Class D estimates from concept information, Class C estimates from schematic design, Class B estimates from developed design and Class A estimates from complete documents, so the range narrows as the decisions get made.
Every estimate is built against the complete scope: land, approvals, servicing, site work, foundation, building, fire protection, fit-out and contingency. That is the difference between a building quotation and a project budget. Our preconstruction work on a 26,500 sq ft industrial building in Vaughan included cost planning through to a construction-ready package.
- From a concept, a program and a building type
- Tests feasibility and compares options
- Free and no obligation on Ontario projects
- From schematic plans, elevations and sections
- Major elements measured and priced
- Supports the investment decision
- From developed design
- Structure, envelope and building systems defined
- Confirms the project still works before full documentation
- From complete documents
- Measured against the full drawings and specifications
- Forms the basis of a fixed price
- Materials and work measured from the drawings
- Scope gaps found before tender
- Grading, stormwater, servicing and foundations priced to the site
- The estimate becomes the working budget
- Changes visible before they happen
- Project accounting and reporting through to occupancy
Class D, C, B and A compared
| Class | Prepared from | Typical accuracy | Used to |
|---|---|---|---|
| Class D | Concept site plan, program and building type | Up to ±30% | Test feasibility, set the first budget and compare options |
| Class C | Schematic plans, elevations, sections and preliminary materials | ±15% to ±20% | Choose the scheme and make the investment decision |
| Class B | Developed design, with the structure, envelope and mechanical systems defined | ±10% to ±15% | Confirm the project still works before committing to full documentation |
| Class A | Complete drawings and specifications | ±5% to ±10% | Establish the basis of a fixed price |
The range narrows at each class because more of the project has been decided. Accuracy figures are Canadian Institute of Quantity Surveyors guidance for expected variance from the contract award price, excluding unusual projects. The assumptions and exclusions matter as much as the total, so read them first.
Start with a benchmark,
then price your site
Per-square-foot ranges are useful for a first conversation and unreliable for a decision. These guides explain what drives the number in each sector and what sits outside it.
Questions owners ask us
Plain answers about construction cost estimating from an Ontario general contractor.
Start Your Project Today
Tell us the site and the program. We will come back with a free, no-obligation Class D estimate against the whole scope, anywhere in Ontario.
Request a Free Concept Estimate →